| Customer Forms |
Newly adoped Rule 3026. Disclosure of Customer Data by a Utility is effective February 14, 2012. The form provided by the Commission that conforms with Commission rules for customers to give consent to a utility for disclosure of the customer's data, is accessible from the button at left. |
| Annual
Reports |
Annual Reports are due April
30th of each year for the previous calendar year. Appropriate forms are provided
to the annual report contact for each utility.
"Annual
Report of Public Utility Intrastate Gross Operations Revenue" - this form DR 525 must be filed in addition to the Annual Report required by this Commission
for maintaining your certification or registration and is due to the Commission by April 30th of each
year for the prior calendar year's gross Colorado Regulated Operating Revenues.
This DR 525 report MUST also be filed with the Colorado Department of Revenue on or before
May 1, 2012.
|
For completing Commission forms below you may need to refer to the:
Securities
and Exchange Commission Forms List
and the Federal
Energy Regulatory Commission eForms
( on the FERC site, click tab for => Electric | click tab for => Gas )
|
| Repository Docket for Annual Reports for Energy Utilities |
DOCKET NO. 12M-129EG
IN THE MATTER OF THE FILING OF ANNUAL REPORTS IN ACCORDANCE WITH RULES 4 CCR 723-3-3006 AND 4 CCR 723-4-4006 BY UTILITIES HOLDING A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO PROVIDE ENERGY SERVICES IN THE STATE OF COLORADO.
Decision No. C12-0165, ORDER CONCERNING FILING
OF YEAR 2011 ANNUAL REPORTS BY
ELECTRIC, GAS, AND STEAM PROVIDERS - PDF and Errata Notice - PDF | (original Appendix A replaced here by corrected Appendix A - PDF ) general instructions and information about additional forms required
On or before April 30, 2012, each utility holding a Certificate of Public Convenience and Necessity to provide electric, gas, or steam service in Colorado during the 2011 calendar year shall file an annual report in the form prescribed in this Order, and any additional reports as required by Appendix A to this Order.
Each filing entity shall also file a copy of the Colorado Department of Revenue Form DR 0525 no later than April 30, 2012. Entities may not request an extension of time to file Form DR 0525.
|
Annual
General Energy Reporting Forms |
| Colorado
PUC Commission Forms - GENERAL
ENERGY |
Form Files |
| Utility
Designee Form (this one not used for Telecom)
The appropriate Utility Designee form must
be completed by all utilities upon application approval and be updated as utility information changes.
The Commission has opened a repository docket, Docket No. 12M-Designee, to facilitate parties E-Filing their Utlity Designee form. This docket number is to be used this year in 2012 with an initial or update Utility Designee filing.
|
|
| FERC
Electric, Gas, Steam, and Water Utility Appendix A -
The information
requested in this questionnaire shall be provided under oath and an affidavit
to be filed with the annual report |
|
| Colorado
Department of Revenue Form DR 525
"Annual
Report of Public Utility Intrastate Gross Operations Revenue"
This form,
DR 0525, must be filed in addition to the Annual Report required by
this Commission for maintaining your certification or registration and is due
to the Commission by April 30th of each year for the prior calendar year's gross Colorado Regulated
Operating Revenues.
This DR 0525 report MUST also be filed with the Colorado Department of Revenue on or before
May 1, 2012.
|
|
WHERE
IS THE ANNUAL REPORT SENT ? |
Colorado
Public Utilities Commission
1560 Broadway, Suite 250 Denver, Colorado
80202 |
| |
Electric
Annual Report Forms |
|
Federal
Energy Regulatory Commission Forms |
Form
Files |
|
Annual Report of Major
Electric Utility
FERC Form No. 1: blank form The
Form No. 1 is a comprehensive financial and operating report submitted for Electric
Rate regulation and financial audits. Major is defined as having (1) one million
Megawatt hours or more; (2) 100 megawatt hours of annual sales for resale; (3)
500 megawatt hours of annual power exchange delivered; or (4) 500 megawatt hours
of annual wheeling for others (deliveries plus losses).
-
FERC
eForms site for Electric - click tab for => Electric
|
|
|
FERC
Form EIA-861, "Annual Electric Power Industry Report"
|
|
| Colorado
PUC Annual Report of Public Electric Utiliities -
Note: The EIA-412 has been replaced by this Colorado PUC Annual Report
of Public Electric Utiliities form =>
|
|
| Colorado
PUC Commission Forms - ELECTRIC |
Form
Files |
|
Sales of Electricity by
Rate Schedules | |
| Municipal
Utilities Electric Sales Outside City Limits |
|
| Steam
Electric Generating Plant Statistics (Large Plants) |
|
| List
of Schedules, Electric Cooperative Association Annual Report |
|
|
| Gas
Annual Report Forms |
|
|
Federal
Energy Regulatory Commission Forms |
Form
Files |
Major
Natural Gas Pipeline Annual Report
FERC Form No. 2: blank form
-
The
Form No. 2 is a compilation of financial and operational information from major
interstate natural gas pipelines subject to the jurisdiction of the FERC. The
form contains data for a calendar year. Among other things, the form contains
a Comparative Balance Sheet, Statement of Income, Statement of Retained Earnings,
Statement of Cash Flows, and Notes to Financial Statements.
-
|
|
Non-major
Natural Gas Pipeline Annual Report
FERC Form No. 2A: blank form |
|
| Sales
of Gas by Rate Schedules |
|
| Colorado
PUC Commission Forms - GAS |
Form
Files |
| Gas
Storage Annual Report |
|
| Municipal
Natural Gas Utilities Annual Report |
|
| Propane
Annual Report |
|
| |
| Oil Product Pipeline Company
Annual Report Forms |
Oil Product Pipeline Company 2011 Annual Report form - PDF | DOC
Instructions per attachment to Decision No. C12-016 - PDF
(in Docket No. 12M-143GPS, see below)
|
DOCKET NO. 12M-143GPS
IN THE MATTER OF THE FILING OF ANNUAL REPORTS IN ACCORDANCE WITH
§ 40-2-111, C.R.S. BY EACH OIL PRODUCT PIPELINE COMPANY OPERATING IN COLORADO INTRASTATE COMMERCE.
Decision No. C12-0164, COMMISSION ORDER CONCERNING FILING
OF YEAR 2011 ANNUAL REPORTS BY
OIL PRODUCT PIPELINE COMPANIES - PDF | Appendix A - general instructions and information about additional forms required - PDF
On or before April 30, 2012, each Oil Product Pipeline Company (Pipeline Company) operating in intrastate commerce within the State of Colorado during calendar year 2011 shall file with the Commission an annual report on the form prescribed in this Order, and any additional reports as required by Appendix A to this Order.
Each Pipeline Company shall also file a copy of the Colorado Department of Revenue Form 0525 no later than April 30, 2012. A Pipeline Company may not request an extension of time to file Form DR 0525.
|
| |
| Water
Annual Report Forms |
| Colorado
PUC Commission Forms - WATER |
Form
Files |
Class
A & B Water Utilities Annual Report
(Gross Revenue $200,000 and over) |
|
Class
C Water Utilities Annual Report
(Gross Revenue of less than $200,000) |
|
Please file with the Commission as follows:
Companies are strongly encouraged to have one of their designated filers submit an executable electronic copy (i.e., MS Excel workbook) in the appropriate proceeding number (Docket No. 12M-127W) via the Commission’s E-Filings system at
https://www.dora.state.co.us/pls/efi/EFI.homepage.
Once in the E-Filings system, select the document type “Annual Report” and in the title field insert the utility’s name, along with “2011 Annual Report.” E-filing is a fast, efficient, and less costly way to submit filings to the Public Utilities Commission.
In the alternative, mail the signed original, one copy, and an executable electronic file on CD. Mail the hard copies and CD to the following address:
Colorado Public Utilities Commission, 1560 Broadway,
Suite 250, Denver, Colorado 80202-5143.
|
DOCKET NO. 12M-127W
IN THE MATTER OF THE FILING OF ANNUAL REPORTS IN ACCORDANCE WITH RULE 4 CCR 723-5-5006 BY UTILITIES HOLDING A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO PROVIDE WATER OR COMBINED WATER AND SEWER SERVICES IN THE STATE OF COLORADO.
Decision No. C12-0151, COMMISSION ORDER
CONCERNING FILING OF THE
2011 ANNUAL REPORTS BY WATER AND
COMBINED WATER AND SEWER PROVIDERS - PDF | Appendix A - general instructions and information about additional forms required - PDF
On or before April 30, 2012, utilities holding a Certificate of Public Convenience and Necessity to provide water or combined water and sewer service in Colorado during calendar year 2011 shall file an annual report in the form prescribed in this Order, and any additional reports as required by Appendix A to this Order.
Each filing utility shall also file a copy of the Colorado Department of Revenue Form DR 0525 no later than April 30, 2012. The utilities may not request an extension of time to file Form DR 0525.
|
| |